Sunday, June 3, 2018

Update 6/2/18 2pm

·         COMPLETED - Electrical power to the data center is now stabilized with dual generators and full battery backups. No target date yet for permanent power restoration.
·         60% Complete - Systematically starting up equipment components to test the reliability of the equipment.
·         COMPLETED – Testing and reconfiguring network connections
·         50% Complete – Repair of network connections. Awaiting arrival of replacement equipment to get reach full capacity. The data center is currently operating with a single connection to the campus network.
·         Ongoing - Purchasing and installing replacement parts and equipment as needed.